Our projects
Project Description: Umm Suqeim Exit Utility Diversion
This critical infrastructure project, executed along Sheikh Zayed Road (Shk. Zayed Road) at the Umm Suqeim Exit, demonstrates Shams Al Ruwais Gardening Works L.L.C.'s specialized competence in utility diversion and relocation within high-traffic, sensitive zones.
The core challenge was the precise DIVERSION (re-routing) of three crucial, intersecting utility lines simultaneously:
Existing Irrigation Main Line: Ensuring the uninterrupted flow of water for municipal landscape systems while constructing the new, rerouted pipeline.
Power Cable: Safely relocating vital electrical infrastructure, requiring detailed planning and adherence to strict DEWA standards to prevent service disruption.
Control Cable: Handling low-voltage communication and control lines, critical for system operations and monitoring.
Successful completion of this project required expert civil engineering, meticulous planning, high safety compliance (ISO 45001), and faultless coordination with the Roads and Transport Authority (RTA) and other concerned utility entities. This is a clear testament to SARGW's capability to manage sensitive infrastructure works on Dubai's most vital transport arteries.


This project underscores Shams Al Ruwais Gardening Works L.L.C.'s expertise in executing complex utility and Mechanical, Electrical, and Plumbing (MEP) infrastructure contracts.
The scope involved the specialized Supply, Installation, Testing, and Commissioning of Glass Fiber Reinforcement Epoxy (GRE) Water Transmission Pipelines and associated critical works. This type of project requires highly certified technical teams, rigorous quality control, and adherence to international safety standards.
Key Technical Highlights:
Material Expertise: Handling and installation of specialized GRE piping, chosen for its durability, corrosion resistance, and high-pressure capacity in demanding environments.
Full Lifecycle Execution: Responsibility spanned the entire project lifecycle, from procurement of materials to final performance validation via Testing & Commissioning.
Infrastructure Integration: Ensuring seamless integration of the new transmission system with existing utility networks, demonstrating expertise far beyond standard landscaping.
This successful execution serves as powerful proof of SARGW’s capacity to manage sophisticated, large-diameter piping and vital water utility systems under stringent client and governmental specifications.


Project Description: DEWA 132KV Cable Shifting & Horticulture Reinstatement
This multi-faceted infrastructure project was executed under stringent specifications related to DEWA's 132KV high-voltage network and the ongoing Dubai Metro (DXBMTRO) development. The primary objective was the precise and compliant diversion of a critical 132KV power cable, alongside associated enabling and reinstatement works.
Key Technical and Logistical Highlights:
High-Voltage Cable Shifting (MEP): The core of the project involved the expert Shifting (Diversion) and Installation of a 132KV power cable. This required rigorous adherence to DEWA's technical standards and flawless execution to ensure the continuity of the essential power grid.
Metro & Roadside Coordination: Works were strategically executed across various sectors (RACECORS Shif NAJM, ENPO, BRSH), necessitating seamless coordination with the Roads and Transport Authority (RTA) and the Dubai Metro project team.
Horticulture Removal & Reinstatement: SARGW demonstrated its full-scope capability by managing the initial Horticulture Removal to facilitate the major utility works, followed by complete Landscaping and Irrigation Reinstatement. This ensured the project site was returned to its original aesthetic and functional state in compliance with environmental and municipal standards.
This project is a high-value testament to SARGW's unique strength in managing civil, MEP, and landscaping scopes simultaneously, under the highest government and utility authority scrutiny.


Project Description: Nadhessa 132KV/11KV Substation Cable Works
This project highlights Shams Al Ruwais Gardening Works L.L.C.'s specialization as an approved partner in crucial electrical infrastructure for the Dubai Electricity and Water Authority (DEWA). The scope focused on the expansion and integration of the Nadhessa 132/11KV Substation network.
The project involved the complete and certified execution of high-voltage works:
132KV Cable Works: The core responsibility was the expert Supply, Installation, Testing & Commissioning of the vital 132KV high-voltage power cables and associated infrastructure. This required extreme precision, specialized technical staff, and strict adherence to DEWA's rigorous safety and quality protocols.
Substation Integration: Successful execution was key to ensuring the reliable and efficient transmission of power between the 132KV and 11KV systems within the substation.
Full Compliance: Project delivery included comprehensive documentation, rigorous Testing, and final Commissioning, guaranteeing all works met DEWA's technical specifications and were ready for immediate operational service.
This engagement is clear evidence of SARGW's elite technical capability to safely and successfully execute critical utility infrastructure projects for major government authorities.


Project Description: Urgent Sewerage System Interconnection
This project highlights Shams Al Ruwais Gardening Works L.L.C.'s specialized role in executing essential civil and utility contracts within Dubai's municipal framework. The core objective was to facilitate rapid integration of an "Urgent Development" into the existing Dubai Municipality (SM) Sewerage System.
This critical scope required high precision and faultless adherence to all DM standards and protocols, demonstrating our expertise in:
Sewerage Network Execution: Detailed installation and connection works to link the new development's internal network with the high-capacity municipal main lines.
Urgent Development Priority: Managing the project under an expedited timeline, showcasing our capability to deploy resources efficiently and coordinate complex civil works rapidly to meet development deadlines.
SM Compliance: All execution, testing, and documentation were completed in strict compliance with Dubai Municipality's technical specifications for sewerage systems, proving our authority and reliability in this key infrastructure sector.
This successful interconnection confirms SARGW's status as a trusted contractor for vital utility and public works, ensuring new developments are seamlessly integrated into Dubai's essential services.


Project Description: Etihad Station Link Infrastructure Works
The Etihad Station Link project represents a significant engagement within Dubai's crucial public transport infrastructure, highlighting Shams Al Ruwais Gardening Works L.L.C.'s ability to execute critical civil and utility contracts in high-stakes environments.
This project focused on essential infrastructure works necessary to connect or integrate with the Etihad Metro Station, a vital transport hub. The scope likely involved:
Utility Integration & Diversion: Precision engineering for the diversion and protection of underground utilities (such as power, irrigation, or communication cables) that interface with the new station's development and access points.
Civil & Enabling Works: Execution of preliminary civil works, potentially including trenching, duct laying, or foundation preparations to ensure the structural integrity and functionality of the link infrastructure.
Landscape Reinstatement: Given your core expertise, the final phase would include the meticulous reinstatement of all disturbed horticulture and hardscape areas to Dubai Municipality standards, ensuring the station environment is aesthetically pleasing and functional.
Successful completion of projects like the Etihad Station Link confirms SARGW's status as a specialized, reliable contractor capable of delivering complex, time-sensitive infrastructure works in direct partnership with, or under the stringent supervision of, major authorities like the RTA and Dubai Municipality.


SHAMS AL RUWAIS
GARDENING WORKS L.L.C
General Enquires :
Email: info@sarscape.ae
#420 A, Al Shaali Building, Damascus Street,
Al Qusais Industrial - 1, P.O BOX: 223238,
Dubai - U.A.E.
© 2025. All rights reserved.
Tel: +971 4234 2405
Mob: +971 50 834 4311
Mob: +971 50 911 2869
Technical Enquires :
Email: mudathir@sarscape.ae
Management Enquires :
Meet us on: